Estimating costs to make items from BPCs

I can view a T2 BPC in contracts, and I can then view that BPC in industry. However, even though it is a 10 run BPC, the runs remaining and job runs are set to -1 and it also doesnt allow me to see the total job cost.

Is there a way of showing this info in the industry window for the number of job runs that the BPC is for?

This topic was automatically closed 90 days after the last reply. New replies are no longer allowed.