I can view a T2 BPC in contracts, and I can then view that BPC in industry. However, even though it is a 10 run BPC, the runs remaining and job runs are set to -1 and it also doesnt allow me to see the total job cost.
Is there a way of showing this info in the industry window for the number of job runs that the BPC is for?